PEC energy flow dashboard

Project EnergyConnect loop flows and negative residues

Since 1 October 2026, Project EnergyConnect has closed a transmission loop between New South Wales, Victoria and South Australia. Physics sets how flow splits around a loop, so when one link is constrained another can carry energy from a high-price region to a cheaper one, earning a negative settlement residue. AEMO's PEC market integration update explains the spring washer pricing behind it.

This page sums AEMO's 5-minute residue on the loop's AC links: Heywood, VNI and PEC. A positive sum means the loop, on net, moved energy from lower to higher prices.

Selected range

Figures as of 18 October 2026, 5:48 pm NEM time.

Running total of net loop residue

A rising net line means flow mostly followed price; a falling stretch means counter-price flow won.

timenet_position_mpositive_intervals_mnegative_intervals_m
2026-10-18 17:003.45111.98-8.531
2026-10-18 17:303.43711.98-8.544
2026-10-18 18:003.43811.98-8.544

Share of each day: net positive vs net negative

Use Time of day to compare solar hours with the evening peak.

daypct_low_to_highpct_counter_price
2026-10-1677.4322.57
2026-10-1761.4638.54
2026-10-1846.4553.55

AEMO 5-minute dispatch residue, not final settlement. Murraylink (DC, outside the AC loop) is optional. AEMO plans to net residues across the loop from 1 November 2026 (go-live plan).

Ask your own question of NEM data

More published analyses and dashboards