Since 1 October 2026, Project EnergyConnect has closed a transmission loop between New South Wales, Victoria and South Australia. Physics sets how flow splits around a loop, so when one link is constrained another can carry energy from a high-price region to a cheaper one, earning a negative settlement residue. AEMO's PEC market integration update explains the spring washer pricing behind it.
This page sums AEMO's 5-minute residue on the loop's AC links: Heywood, VNI and PEC. A positive sum means the loop, on net, moved energy from lower to higher prices.
Selected range
Figures as of 18 October 2026, 5:48 pm NEM time.
- 72.61% of intervals: net flow low to high price
- 27.39% of intervals: net negative residue
- 3.438 $m net loop residue
- -8.544 $m from net-negative intervals
Running total of net loop residue
A rising net line means flow mostly followed price; a falling stretch means counter-price flow won.
| time | net_position_m | positive_intervals_m | negative_intervals_m |
|---|---|---|---|
| 2026-10-18 17:00 | 3.451 | 11.98 | -8.531 |
| 2026-10-18 17:30 | 3.437 | 11.98 | -8.544 |
| 2026-10-18 18:00 | 3.438 | 11.98 | -8.544 |
Share of each day: net positive vs net negative
Use Time of day to compare solar hours with the evening peak.
| day | pct_low_to_high | pct_counter_price |
|---|---|---|
| 2026-10-16 | 77.43 | 22.57 |
| 2026-10-17 | 61.46 | 38.54 |
| 2026-10-18 | 46.45 | 53.55 |