NEM solar curtailment: share of solar energy spilled
Spilled solar energy in the NEM
The share of utility-scale solar farm energy spilled across Australia's National Electricity Market (NEM) each month, against installed solar farm and grid-scale battery capacity. Spilled energy is output a solar farm had available but was not dispatched to generate: network curtailment plus economic offloading. Pick Region at the top of the page to see one state's solar farms and batteries instead of the whole NEM.
Last 12 complete months
Figures as of 23 November 2026, 6:49 am NEM time.
- 15.41% of solar farm energy spilled
- 15.31% spilled in the 12 months before
- 14.68 GW solar farm capacity
- 13.8 GW grid-scale battery capacity
Share of solar farm energy spilled
Spill peaks every spring. The 12-month rolling line takes the season out; read its direction against the capacity chart below.
| month | spilled_pct | spilled_12m_pct |
|---|---|---|
| 2026-08-01 | 8.745 | 16.15 |
| 2026-09-01 | 20.99 | 15.83 |
| 2026-10-01 | 21.44 | 15.41 |
Installed solar farm and battery capacity
Registered capacity at each month end, on the same time axis as the spill chart above. Spill that flattens or falls while solar capacity keeps rising means the extra output is finding a use.
| month | solar_gw | battery_gw |
|---|---|---|
| 2026-08-01 | 14.68 | 13.04 |
| 2026-09-01 | 14.68 | 13.8 |
| 2026-10-01 | 14.68 | 13.8 |
Spilled solar energy by cause
The two add up to the monthly spill. Offloading is output offered above the spot price, so it shrinks when midday prices rise; network limits hold back curtailed output whatever the price.
| month | network_pct | economic_pct |
|---|---|---|
| 2026-08-01 | 4.759 | 3.986 |
| 2026-09-01 | 11.34 | 9.656 |
| 2026-10-01 | 14.06 | 7.371 |
Spilled solar energy in the selected month, year by year
Pick the month with Month at the top of the page. Each bar is that month in one year, so the season cancels out; its height is the share spilled.
| month | network_pct | economic_pct |
|---|---|---|
| 2024-10-01 | 6.389 | 17.85 |
| 2025-10-01 | 5.34 | 20.69 |
| 2026-10-01 | 14.06 | 7.371 |
Solar farm and battery capacity in the selected month, year by year
Registered capacity at the end of the selected month in each year, under the bars above.
| month | solar_gw | battery_gw |
|---|---|---|
| 2024-10-01 | 10.59 | 3.828 |
| 2025-10-01 | 13.1 | 8.874 |
| 2026-10-01 | 14.68 | 13.8 |
Method, sources and caveats
- Available energy is each semi-scheduled solar farm's dispatch availability, summed over every 5-minute interval in the month. Spilled is the part of it the farm was not dispatched to generate.
- Network curtailment and economic offloading follow the split AEMO uses in its Quarterly Energy Dynamics reports. Output offered below the spot price but not dispatched was held back by network limits. Output offered at or above it was offloaded on price.
- Capacity is AEMO registered capacity at the end of each month, units still commissioning included. Solar counts the semi-scheduled farms behind the spill figures; small non-scheduled solar farms have no dispatch availability and are left out. A battery that re-registered as one bidirectional unit in 2024 counts once.
- Region picks the solar farms and batteries registered in that NEM region. Series start when the region's first semi-scheduled solar farm does: NSW in 2015, Queensland, Victoria and South Australia in 2017-18. Tasmania has no grid-scale solar farms or batteries, so it is not offered.
- Household batteries and rooftop solar are not in AEMO's dispatch data, so they are not shown.
- The current, part-finished month is left out.
For individual farms, see Most constrained solar farms. For wind and solar by region, see NEM wind and solar curtailment by region.
Contains material sourced from AEMO. SCADA Miner transforms and analyses the source material; results are not endorsed by AEMO.
Build a dashboard like this
An AI agent built this page from a plain-English request using NEM Explorer, which holds AEMO market data from 2009 onward. The page re-runs its queries against the latest data each time it is opened. Ask for your own at chat.scadaminer.com, or connect Claude Code or another MCP client to NEM Explorer and have it save one for you. The request behind this page was close to:
Make a dashboard showing the percentage of utility-scale solar farm energy spilled across the whole NEM over the years, against installed solar and battery capacity, plus the same for one month picked from a drop-down. Add a state selector.
Ask your own question of NEM data
More analyses
NEM wind curtailment: share of wind energy spilled
Share of NEM wind farm energy spilled each month since 2009, split into network curtailment and economic offloading, against wind and battery capacity.
NEM peak and minimum demand records, by year and state
Record peak and minimum electricity demand in the NEM and each state, every year since 2009: the day, the time and the MW. Live AEMO data.
NEM transmission line loading map: where the grid has room
How heavily each NEM transmission line is loaded against its real-time rating, which way power flows, by season and hour. From AEMO NEMDE data.