NEM transmission line loading map: where the grid has room
Transmission line loading
How hard each NEM transmission line works against its rating, and which way power flows along it. Each line is drawn straight from bus to bus and coloured from blue (lightly loaded) to red (at its rating). An arrow shows the way power flows at least 70% of the selected hours; a dot means it flows both ways.
Siting a load or a generator. A new load relieves a busy line when it connects at the end power flows away from, because it uses power that would otherwise leave along that line. At the end power flows into, it adds to the line. A new generator is the other way round. Pick the season and hours that matter for your project: a solar-soaked midday and a winter evening load the network very differently.
Selected period
Figures as of 8 November 2026, 1:43 am NEM time.
- 594 lines carrying power
- 15.59% median average loading
- 93.6% of them average under 30%
- 6 lines idle all period
- 91 lines with no map position
Line loading and usual flow direction
Colour follows the 'Colour lines by' choice; hover a line's midpoint for all three measures and its usual direction. Zoom with the buttons at top right.
| line | loading_pct |
|---|---|
| HGTS_TRTS1_500: Haunted Gully TS 500kV – Tarrone 500kV (500 kV) | 0 |
| GTS_PTH1_220: Geelong 220kV – Point Henry 220kV (220 kV) | 0 |
| GTS_PTH2_220: Geelong 220kV – Point Henry 220kV (220 kV) | 0 |
| GNTS_SHTS3_220: Glenrowan 220kV – Shepparton 220kV (220 kV) | 0 |
| DDTS_SHTS_220: Dederang 330kV – Shepparton 220kV (220 kV) | 0 |
| FA_QU_SR_HM: Farrell – Hampshire (110 kV) | 0.04652 |
| FA_QU_SR_HM: Farrell – Savage River (110 kV) | 0.04652 |
| FA_QU_SR_HM: Farrell – Que (110 kV) | 0.04652 |
| FA_QU_SR_HM: Farrell – Waratah Tee (110 kV) | 0.04652 |
| BU_HM: Burnie – Hampshire (110 kV) | 0.05039 |
| GT_TV1: George Town – Tamar Valley PS (110 kV) | 0.104 |
| 0X1: Buronga 220kV – Red Cliffs 220kV (220 kV) | 0.6072 |
Net power leaving each substation
Red substations send power out over their lines on average (local generation exceeds local load); blue ones draw it in. Load placed at a red one uses power that would otherwise travel away.
| substation | net_out_mva |
|---|---|
| Sydney West 330kV | -1,296 |
| Boyne Island 275kV | -865.7 |
| Sydney South 330kV | -860.9 |
| Tomago 330kV | -849.1 |
| Sydney North 330kV | -799.7 |
| Heywood 500kV | -625.4 |
| Bouldercombe 275kV | -467.9 |
| Newcastle 330kV | -463.9 |
| Rowville 500kV | -403.9 |
| South Pine 275kV | -371.1 |
| Cranbourne 220kV | -356.2 |
| George Town | -315 |
Substations sending out the most power
Where a new load would soak up local surplus. Power station switchyards lead the list: the lines out of them were built to carry their output, and the room grows as stations retire.
Line loading by hour of day
Across the lines selected, ignoring the hour filter. The 90th-percentile line shows how hard the busier lines work at each hour.
| hour_of_day | median_line_loading_pct | p90_line_loading_pct |
|---|---|---|
| 0 | 14.53 | 25.36 |
| 1 | 14.23 | 24.87 |
| 2 | 14.1 | 24.74 |
| 3 | 13.97 | 24.75 |
| 4 | 14.14 | 24.78 |
| 5 | 14.43 | 24.95 |
| 6 | 14.63 | 26.53 |
| 7 | 15.31 | 29.05 |
| 8 | 15.46 | 30.45 |
| 9 | 14.93 | 31.65 |
| 10 | 14.69 | 31.61 |
| 11 | 14.47 | 31.33 |
Lines by average loading
The 50 lines at the end of the range set by 'Line table'. Lines that never reached 1% of their rating (out of service, or idle) are left out.
Method
- Loading is the measured MVA flow on each line end as a percentage of the NORM real-time rating AEMO's dispatch engine applied in the same 5-minute interval. That rating already moves with the weather and the season. Both come from the SCADA inputs of AEMO's NEMDE case files, from July 2009. A line measured at both ends takes the higher end. Average loading is over the selected days, season and hours. A line that never reached 1% of its rating in the period counts as idle: out of service, or connected but carrying nothing.
- Direction is the share of those intervals in which power flowed from one end to the other. The readings are snapshots taken just before each interval starts, not interval averages.
- Net power out of a substation sums the average flow out along each of its lines, in MVA (apparent power, close to MW on transmission lines). It counts lines only, not transformers.
Caveats
- Lightly loaded is not spare capacity. AEMO keeps the system secure against any credible contingency, such as losing a line. Parallel circuits can be at their limit while each carries about half its rating, because if one trips the other takes the flow. Treat a lightly loaded line as a lead to check against binding network constraints and a connection enquiry, not as proof of headroom.
- Data trails real time by one to two months, because AEMO publishes each month of case files about four weeks after it ends.
- Lines are straight bus-to-bus segments, not their real routes. A tee'd line is drawn as branches from one end. Lines whose substations have no known position are counted above but not drawn.
- Distribution networks below about 66 kV are not in the data.
Sources: AEMO NEMDE case files and network equipment tables; substation positions from AEMO's network map and Electricity Infrastructure, © Commonwealth of Australia (Geoscience Australia) 2026, CC BY 4.0.
Ask your own question of NEM data
More analyses
NEM intraday price spread for battery arbitrage
A grid battery earns its energy margin by charging in the cheapest part of the day and discharging in the dearest.
NEM wind and solar curtailment by region
Curtailment is wind and solar energy that was available but not dispatched. Every 5 minutes AEMO forecasts what each semi-scheduled wind and solar farm…
NEM spot price vs demand: how prices rise near peak demand
How NEM spot prices change with demand, NEM-wide and by state: typical prices, negative and $300+ intervals at each level of demand. Live AEMO data.